Brick & Material Calculator
Tell us about your structure and get an instant, itemised estimate of the bricks, cement, sand, aggregate and steel it will take to build — plus paint and tiles for a turnkey finish.
Total covered area across every floor — e.g. a 5 marla house with two similar floors is about 2,700 sq ft.
Informational only — your covered area above should already total every floor.
RCC Framed uses columns and beams with brick infill — more steel, fewer bricks. Load Bearing walls carry the structure directly — more bricks, less steel.
Turnkey adds plaster/flooring cement and sand, plus paint and floor tile quantities.
Used for the cost estimate context below — structural quantities don't change by tier.
These are planning-stage estimates from standard thumb-rule quantities and placeholder market rates — not a Bill of Quantities. Always verify final quantities and pricing with a Buraq project consultant before ordering materials.
Estimated Total Material Cost
PKR 49.6 Lakh
PKR 4,960,200 · Standard tier · Grey Structure
| Structure Materials | Quantity | Estimated Cost |
|---|---|---|
| Bricks | 13,650 pcs | PKR 2.18 Lakh |
| Cement | 588 bags (50kg) | PKR 11.17 Lakh |
| Sand | 2,940 cft | PKR 3.23 Lakh |
| Crush / Aggregate | 3,570 cft | PKR 5 Lakh |
| Steel Reinforcement | 9,660 kg(9.66 tons) | PKR 28.01 Lakh |
Want An Exact Material List?
Send us these numbers and a Buraq engineer will follow up with a site-specific Bill of Quantities.