Construction Cost Estimator
A quick, indicative sense of what your build could cost — based on covered area, storeys, finish level and scope.
Roughly 272 sq ft per marla — a 10 marla plot with a full covered footprint is about 2,720 sq ft.
Informational only — your covered area figure above should already total every floor combined.
Grey structure covers foundation, frame, roofing and brickwork only. Turnkey adds complete finishing, fixtures and fittings.
These figures are indicative estimates built from placeholder market rates, not a formal quotation. Always verify final costs with a Buraq project consultant before budgeting.
Estimated Total (Turnkey)
PKR 1.04 Crore
PKR 10,400,000 · PKR 5,200 per sq ft
Cost Breakdown
| Category | Estimated Amount |
|---|---|
| Structure (Foundation, Frame, Roofing) | PKR 3,952,000 |
| Finishes (Flooring, Paint, False Ceiling) | PKR 2,704,000 |
| Electrical | PKR 1,040,000 |
| Plumbing | PKR 936,000 |
| Fixtures & Fittings (Kitchen, Bath, Doors) | PKR 1,768,000 |
| Total | PKR 10,400,000 |
Want This In Writing?
Send us these numbers and we'll follow up with a proper site-specific quotation.